AN41G PowerHA SystemMirror 6.1 Planning, Implementation and Administration
Corso
A Segrate
Hai bisogno di un coach per la formazione?
Ti aiuterà a confrontare vari corsi e trovare l'offerta formativa più conveniente.
Descrizione
-
Tipologia
Corso
-
Luogo
Segrate
-
Durata
5 Giorni
Learn to install and configure a highly available cluster using PowerHA for AIX. The lab exercises are conducted on an AIX 6.1 level system. This course provides lectures and hands on labs in an instructor lead course environment, either in a face-to-face classroom or in a live virtual classroom environment (ILO - Instructor Led Online).
Sedi e date
Luogo
Inizio del corso
Inizio del corso
Opinioni
Programma
Il centro presenta a continuazione il programma pensato per migliorare le tue competenze e permetterti di realizzare gli obiettivi stabiliti. Nel corso della formazione si alterneranno differenti moduli che ti permetteranno di acquisire le conoscenze sulle differenti tematiche proposte. Inscriviti per poter accedere alle seguenti materie.
Day 1
- Unit 1 - Introduction to PowerHA for AIX 5L
- Unit 2- Basic Application and resource group considerations
- Exercise 1
- Exercise 2
Day 2
- Unit 3- Basic Network considerations
- Unit 4- Shared storage considerations for high availability
- Unit 5 - Initial cluster configuration steps
- Exercise 3
- Exercise 4
- Exercise 5
Day 3
- Unit 6 - Verification and basic monitoring
- Unit 7 - Additional network and application considerations
- Unit 8 - Additional cluster configuration steps
- Exercise 6
- Exercise 7
- Exercise 8
Day 4
- Unit 9 - Basic PowerHA administration
- Unit 10 - Events
- Exercise 9
- Exercise 10
Day 5
- Unit 11 - Problem determination and recovery
- Unit 12 - PowerHA installation
- Exercise 11
- Open Lab
Dotazione:
Each participant will have a station set up with operating systems and software needed for the exercises.
Ulteriori informazioni
- Explain what high availability is.
- Outline the capabilities of PowerHA for AIX.
- Design and plan a highly available cluster.
- Install and configure PowerHA for AIX in the following modes of operation: Single resource group on a primary node with standby node; and Two resource groups in a mutual takeover configuration
- Configure resource group startup, fallover, and fallback policies
- Perform basic system administration tasks for PowerHA.
- Perform basic customization for PowerHA.
- Perform basic problem determination and recovery.
Hai bisogno di un coach per la formazione?
Ti aiuterà a confrontare vari corsi e trovare l'offerta formativa più conveniente.
AN41G PowerHA SystemMirror 6.1 Planning, Implementation and Administration